Our last full day before
going back to work was spent getting the kitchen to a point where we could use it
to cook again and be able to move some stuff back in. To start Tom put a coat
of sealer on the back splash grout and I caulked the edges. The outlet needed an
extension piece due to the extra depth from the tile, so we switched it from a
cream one to a white one at the same time.
The upper cabinets got a
final coat of white paint, both inside and out.
We recruited my brother and
dad for help to move the fridge and stove back into the room. The stove just
fit, honestly there is less that 1/8” clearance and I was so happy it fit after
all the problems with the counter ends.
In the corner cabinet, I
installed the half circle lazy susan unit. This set was from Lee Valley ;
it came with brackets that screwed into a vertical post and 2 shelves that
clipped into them. Installation was easy, the only issue was the screws that
came with it; they were such bad quality that the head broke off when you tried
to screw them in.
As you can see the cat came
home today and gave her approval to the lazy susan. And now we know: my timeline for the kitchen was a little too ambitious. I wish we were a little further along before we had to go back to work but it is operational even without any cabinet doors.