Today was the day we tackled
hanging the giant pantry doors. These monster doors are 24” wide by 7 ft high
and have 4 hinges each, so hanging them was definitely a 2 person job.
Surprisingly, it was not as hard as predicted, once the top hinge and bottom
hinge were in place, the center 2 were easy to do.
Next was hanging the base
cabinet doors and drawer fronts. They went on fairly easily, I marked the
overlay with painters tape and then determined the placement of the hinge. There
is a lot of room for adjustments with this type of hinge, so you can play with
it to get everything lined up perfectly.
Next was hanging the base
cabinet doors and drawer fronts. They went on fairly easily, I marked the
overlay with painters tape and then determined the placement of the hinge. There
is a lot of room for adjustments with this type of hinge, so you can play with
it to get everything lined up perfectly.
Down in the shop, I
assembled more upper cabinet doors. Yesterday I had cut the centre plywood
panel and Tom sanded them in preparation.
And know we know: It’s much
easier to align drawer front if you build a complete box and then attached the
front while the box is in place on its hinges, vs pre-attaching it then
trying to fiddle with the hinges, like I did for the bedroom dressers.
No comments:
Post a Comment