All of a sudden time seems
to be sneaking up on me and I am feeling stressed about all the work still to
do before our install date of October 1st. What happened to the
month of September and all those free weekends???
My plan was to have the base
cabinets complete by the end of the weekend, leaving the doors, drawers and
bases as the only remaining work. I will tell you now I was not successful. To start
I cut, sanded and primed the shelf supports then installed the shelves in the
cabinets
Before I could attach the
face frames, I wanted to get the wine slots painted, so I started with the
black. The first coat was fine, but as soon as I started with the 2nd
coat it was chipping and scratching like crazy. Not sure what to do, I tried a
coat of primer overtop, which also chipped, so I abandoned it for the time
being.
By this time all the
cabinets except the sink one had migrated upstairs into our front room and I
attached the corner cabinet and the one to the left of the stove together. This
is now enormous and hard to rotate.
The face frames for 2 of the
cabinets got attached with the finish nailer and the holes filled. They still
need a coat of paint or 2, but that’s not a priority right now.
Sanding and priming of the
drawer fronts is also complete now…
As is priming of the lower
cabinet doors
The front room is looking a
more than a little chaotic at this point…