I’ve decided that my project for while Tom is in Miami is the kitchen. I can’t live with exposed ceiling drywall and holes in the wall for much longer, never mind the dented and scratched cabinet doors. Usually I do something to surprise him but this was too big a job and I had to start prepping before he left.
There was prep for the cabinets; filling wood, cracks and nail holes

Prep of the walls and ceiling; patching the drywall

Prep of the cabinet doors; filler and sanding

Picking new paint colours

Buying new hardware

And know we know: prep takes a while, but makes a major difference
No comments:
Post a Comment