Tuesday, May 20, 2014

Front Porch Construction Part 4 – Deck Boards and Railings

On this final day off work, I started installing the deck boards. They are 5/4x6 deck boards installed with 1/8” gap and cut so they overhang ½” on each end. 
With all the decking screwed in place, I framed out the base of the columns with 1x6 fence board to a height of 36”. There will be trim added around the top once I figure out where to buy PT trim or cut my own with the router.
Next on the agenda was starting on the railings, but before I could do so, I had to remove the 2 remaining pieces of the old metal railings, where they attached to the house. This was screwed into the old stucco somewhere behind the siding. I was putting of doing this as I was worried about messing with the siding. It took almost an hour to dig them out, the bolts were rusty, bent and it was hard to fit tools into the small space. In the end my Mum stopped by and together we wrestled them out. Now there is a hole that I’m not sure what to do with...
Getting back to the fun stuff, I installed a 2x2 post at the end next to the house and cut the handrail for along the top. The bottom rail is another piece of 2x2 with 2x2 spindles spaced 3 ¼” apart. I’m happy with the look of these; they are not too heavy and look polished. 
And that’s as far as I got this long weekend. Still to do is the remainder of the railings, adding some trim to the columns, covering the underside of the awning in beadboard and them sanding/paint/stain. I’m happy with the progress made, it is to a point where we can use this entrance safely again, it was less than ideal trucking groceries in through the back.
And now we know:  2x2 lumber is ever so slightly larger than 2x2 railing spindles, by 1/16” to 1/8”, just enough so they don’t line up just perfectly.  

Monday, May 19, 2014

Front Porch Construction Part 3 – Cutting the Stair Stringers

At this point in the project most of the heavy lifting was behind us and I was mostly on my own to do the precision wood stuff. Although sick with a cold, Tom did help me spread gravel and remove the form from the concrete pad.
I spent much of the rest of the day working on cutting the 4 stair stringers from 2x12’s. Once we had the frame and concrete pad in place, the height ended up being 1” less that anticipated, so I had to adjust all my stair calculations. The risers ended up being 6 5/8” and the treads 10 1/8” each.
Installation of the 4 stringers was next, I had bought brackets for this and they went in easily. Good thing too as I had to do it twice...once they were in place I realized the middle too were sticking out too far and had to be cut down slightly. This was due to my design for the riser, I wanted them installed without the ends showing on the sides and had cut little lips into the stringers to accommodate this. In the end all was in back place with blocking between.
Finally I got the boards for the stair risers installed; 1x6 fence boards screwed in place. There are also a few deck boards cut to size, but none of those are screwed in place yet.
And now we know: from a time perspective I understand why people buy the pre-made stringers, it is very time consuming to make them yourself...but overall cheaper and better made and more customizable...so I think it was worth the time 

Sunday, May 18, 2014

Front Porch Construction Part 2 – Installing the Posts, Frame and Joists

For day 2, we started with patching the concrete in the area behind the stairs. There was a long thin gap just above the block and below the door that we were afraid water would pool into. I go this new to me stuff called hydraulic cement to fill it in. Turns out that stuff dries crazy fast...like in less than 5 minutes from when you mix it. My dad would mix it a cup at a time, I would slather in on and it was dry before we even got it all up on the wall. In the end the area did get filled and we used the extra to fill in the mortar lines between the foundation blocks.
We uncovered the concrete footings and I was happy to see they dried without cracks and the metal brackets were still in place.
Next we worked on attaching the ledger board to the foundation. I cut a 2x12 to length and marked the placement of the bolts, all at least 2” from the mortar lines of the blocks. To get the sleeve anchors in place, we used a hammer drill to make 5/8” diameter holes in the concrete. Easier said than done; Tom, my dad and I each took turns using the drill for a bolt at a time. The drill was a rental, it had no power and the chuck didn’t tighten anymore. Needless to say this was a slow and unpleasant job, there was so much vibration that my arms itched after using it.
Once all the holes were in place, we hammered in the anchors, added caulk to the holes and tighten the bolts to secure them. I was concerned about this part of the project; which type of anchors, was drilling into block strong enough, would be block crack, etc, but it feels very strong once in place. 
The posts were next, I decided to use 4x4’s and they run from the concrete footings we poured to the underside of the overhang. Once cut to length, we got them in place, leveled them and screwed at both ends. From there we built the frame with 2x10’s, screwed in from the side to the ledger and clamped to the post for now.
After adding a 2x8 joist at each side, we used 3/8” diameter bolts that run through the exterior frame, the post and a joist. There are 3 at each side in a vertical line.
Now that the frame was secured, we could add the remainder of the 2x8 joists at 16” on center. I bought joist hangers for this and it was quick to get them all screwed in place.
Another day done, we had reached a good level of completion. At least it was easier to get the tools into the front room as you could stand on the frame.

And now we know: do not rent a hammer drill or rent a better quality hammer drill. When you rent a one you have to BUY the bit as they don’t rent out the bits....

Saturday, May 17, 2014

Front Porch Construction Part 1 – Digging Posts and Pouring Concrete

The first day of construction on the new porch had a few setbacks, but nothing major. My parents joined Tom and I and we started by trying to even the ground. We quickly discovered there were still concrete footings in the ground that needed to be removed.
This was a big job, one of them was 24” deep but the other went down at least 4 ft and we could still not see the bottom. The guys tried with the sledge, then using 2x4’s as levers, even tried to drill it with the hammer drill with no luck.
After a few hours, Tom finally went back to the sledge and managed to split off 24” from the top. We buried the rest; it was deep enough that it can stay down there and not impact the new supports.
Next we dug the holes for the sono tubes. I ended up using a manual digger that you rotated, it was fun, a great workout and relatively easy as the soil was loose from all the rain we’ve been having. The holes are 8” wide and 4 ft deep and they ended up being slightly off from where they were supposed to be located, due to another huge chunk of concrete that was in the way. I also built a form for the concrete pad that the stairs will rest on and put in a base of gravel in both areas.
The guys mixed the concrete in a wheelbarrow, Tom had never done this before and was surprised at the amount of work it takes to mix, that stuff is heavy! Both areas got poured and covered for the night to keep in the humidity as it sets.
At this point we called it a day; there was little else we could do until the concrete set.

And now we know: there was a crazy deep concrete footing under the porch

Tuesday, May 13, 2014

Front Porch Demolition Part 2 - Concrete Step Removal

After a lot of discussion and trying to be realistic about timelines, we decided to have the concrete step removed by a waste removal company. We figured that the time to do the demoing and hauling of all that concrete was worth the extra money over what it would cost us just to dispose of the waste.

They brought in a digger with a jackhammer attachment, as well as a trailer for removing the waste. Once they started removing sections, they discovered that there were actually 2 concrete steps, the second poured on top of the first. In the end it took 3 guys 5 hours...I think it was well worth the cost!
 Since they had the rental of the machine for the day, they offered us a deal to remove the concrete around the north side of the house, along the driveway, so we had that removed as well. Turns out there are quite a few cracks on that side of the house, so we may have opened a can of worms there.
And now we know: whoever built the step did not parge the block foundation behind it, so that will need to be done this summer

Sunday, May 11, 2014

Front Porch Demolition Part 1 - Adding Supports to the Front Awning

Between mother’s day festivities, Lauren and I started demolition of the front porch. We started by bracing the awning with 2x4’s, a vertical piece with a 24” section screwed at the end in a T-shape, and another piece screwed to the underside of the awning to brace it against.
This didn’t seem to provide enough resistance; the structure was still sinking into the earth, so we added 2 horizontal boards underneath the ‘T’. This was effective to combat the sinking, but there was still the fear that the bottom would be pushed out sideways from the downward force. In the end we purchased some 2 ft sections of rebar and hammered them on the outside of the ‘T’ pieces. 
Once the awning was supported we could start removing the old metal railing. The bottom sections came off easily and we also managed to disconnect the posts at the top. This was as far as we got during our limited window of working time.
And now we know: the rebar was an unforeseen purchase, so I hope to re-use it in another project. I didn’t realize the supports needed to be quite so complex, I was just planning to lean up the 2x4’s and call it a day 

Saturday, May 10, 2014

Upholstering Dining Chairs Part 8 – Closing the Backs

After today’s work 6 of the chairs are complete except for the outside back piece of navy fabric. In order to close in the backs, I added 2 strips of vertical webbing to each.
 Next I stapled on 2 layers of heavy scrap fabric to give some strength.
And now we know: the chairs are comfy, we brought one upstairs to try out during dinner and they passed the Tom comfort test!