Monday, September 12, 2011

Done, the Table is Done

I am so happy this table is done. After the bad stain of the previous weekend I went out and got 4 more different stains, all of which we hated. So I decided to forgo the stain and leave it natural. I set to removing the dark stain which was a LOT of sanding, so much sanding that my shoulders were aching at the end of the day. The inset middle part of the underside I left stained dark, it would have taken forever to remove the stain from all those small areas and in truth it looks nice with the contrast…not that anyone will really see it being that it is underneath.

After the marathon sanding session, I put on a couple of cost of polycrylic finish in a semi-gloss and left it to dry. Monday night I assembled the legs, glued/screwed the cross bracing in place and the table was done.

I’m really happy with how it turned out. It is solid and has a nice even surface with a nice sheen to it. Even Tom is happy, he had gotten irritated with the top being on our dining table for 2 weeks (there was no where else large enough to put it) and gave me a deadline of Tuesday to complete it by. I met the deadline but did not appreciate the pressure he put on me. In the end I am very pleased to have done this, I think I learned a lot and proved to Tom that I am capable of producing nice stuff.

And now we know: looking back this felt long but was only a little over 2 months and I only worked on it for maybe half of the weekends in that time. Summer has so many other commitments that a project like this gets dragged out.

Monday, September 5, 2011

Table Progress

This weekend was 3 days of almost non-stop work on the table. I cut the cross braces and started to work on attaching the legs to the table top. Because of the weight of the table top, I wanted the legs to be removable so it would be easier to relocate when we eventually move. I decide to use a strip of wood on each side of the table leg and have a bolt run through all 3 pieces. It is hard to describe but requires a hole to be drilled though all 3 in the same location. This proved hard to do. I had already attached the 2 cross pieces before realising the drill would not fit into the space. Out came the crow bar to pry them off, then off I went to cut new ones as the old one were destroyed in the process.

After struggling for a couple of hour to get holes that lined up on all the pieces and were straight, we went over to Tom’s grandfathers for help. I though he would use his drill press and quickly bust out the holes but since I had already started; he helped me do it manually with a vice and a drill.

Once that was done I spent Labour Day doing final sanding and even put a coat of stain on the legs and underside of the table. Unfortunately it looked terrible. The stain was so dark that all the grain of the wood was lost. It seemed pointless to buy expensive wood then finish it so you can’t see it so next weekend I guess I will be removing stain.

And now we know: always test stain and don’t bother buying expensive wood if you plan to stain it really dark

Wednesday, August 31, 2011

We Got Robbed

They pried open a window to get in.

TV and gaming systems gone.

Laptop gone.

Cameras, spare keys to the car and ipod gone.

Sucks.

Sunday, August 14, 2011

Routering

Well, we fixed the router. I used a broken chisel to take the point off the screw then used a screw extractor bit to remove the main part. This is the good news. The bad news is that one of my new bits got destroyed! See all the blades got chopped off somehow…

I worked on my dining table all day, the intention was to cut out 4 slots for the legs to sit in using the router. I built a jig out of pine, essentially 3 sides of a rectangular to act as a guide for where the router should go. I used the largest straight bit I had, a ¾” wide one, to cover the largest area at one time. As I wanted the cut-out to be ¾” deep and the bit was not that tall I did 3 sweeps with the router for each cut-out, each time lower the bit another ¼”.

In the end the slots turned out really well, the right size for the legs to slot into. But half way through the last slot the bit got destroyed as I showed above and I had to use a much thinner ¼” one. This meant the jig had to be jerry rigged and adjusted a lot. I have no idea why this happened to good quality bit. Well at least I got my slots done and I don’t have to use the router again on this project. This tool seems to be beating me, just when I think I’ve got the hang of it, it does something funny.

The herringbone end table top is all put together. Next for it is sanding and then assembling. Is it weird that I enjoyed cutting and placing all those little rectangles?

And now we know: actually I don’t know why the bit got ‘eaten’. Hopefully a diagnosis to come.


Saturday, August 13, 2011

Finishing the Back Room

With the helper kitteh by my side, I painted the back room. I’m happy this one is done, as all reno’s do, it took longer than expected.

The room is all back together and looking very clean. I really like the new furniture arrangements; it is so nice to look out at the tree through the window.

And now we know: I guess there is an alternate way to arrange furniture in this room

Friday, July 22, 2011

Day 5 of Our Summer Week of Reno’s

I was left alone for Friday while Tom went to the cottage for emergency tree removal. After a tornado hit the area the previous weekend, a tree was resting on the corner of the cottage and the guys spent the day trying to remove it with a chain saw.

While he was out of my hair, I did a light sand and got a 2nd coat of mud on the new drywall.

Then I moved to the freshly sanded stairs, wiping them with a tack cloth before applying 2 coats of varathane finish, an hour apart, to every second tread. This allowed us to still access the upstairs while allowing the varathane to not be walked on for 24hrs.

My final project of the day was to install new quarter round in the upstairs hallway where the carpet was removed.

I also caulked it and finally caulked around the new door that we installed when renovating the master bedrooms closets over a year ago

And now we know: not related to our renovation but boys do dangerous things when taking down trees. For example using a rope to pull on a huge tree while standing downhill from it…


Thursday, July 21, 2011

Day 4 of Our Summer Week of Reno’s

Both Tom and I were tiered by this point in our reno (Thursday of the week) and doing manual labour in the heat with no air conditioning was really tough. We
made an executive decision to not continue with the attic insulation project, leaving in for sometime in September or October when the temperature cooled. This meant the crawl space would be empty of insulation for a couple of months, but we could see no harm in that. So we moved on to other jobs and with the half way point of our week off behind us, I finally got the first coat of mud up on the drywall.

We also got around to re-caulking around the bathtub. Tom removed the old stuff and we both stood in the tub while I applied the new stuff. Shower’s at my parents house were in order that night.

While Tom got the new pressure washer going and started on the siding, I returned to my plastic enclosed bubble and sanded the rest of the stairs. Unfortunately the lack of ventilation turned it into a sauna, making me sweaty and giving the sanding dust something to stick to. My husband ‘lovingly’ ordered me to hose off as soon as I emerged so as not to spread dust throughout the house.

And now we know: the pressure washer makes a big difference to the colour of the siding from ‘dirty white’ to ‘slightly dirty but much brighter white’