Saturday, July 6, 2013

Powder Room - Final Touches

I’ve been wrapping up the powder room project starting with touching up the grout. The bottom right corner of the wall tile, where the drywall patching was done, needed a bit more grout to fill in the seem.
Once that bit of grouting was done, I put 3 coats of sealer on the wall tile and the floor grout.

Along the edges of the sink, I caulked the gap, which looks much more polished and water proof.
Although the powder room is ‘done’ in the construction sense and we are using it now, there are still a few outstanding items. The trim around the door and the door need painting. The vanity doors need to be hung. I need to find a mirror; the old one looked too busy with the tile. Also the room needs some art and maybe a shelf or something above the toilet. There is no rush on that stuff so it will probably be another couple of months before they are in place.

And now we know: a fun new trick to caulking; wet your finger and run it along the caulking to make it look extra smooth. 

No comments:

Post a Comment