I’ve been wrapping up the
powder room project starting with touching up the grout. The bottom right
corner of the wall tile, where the drywall patching was done, needed a bit more
grout to fill in the seem.
Once that bit of grouting
was done, I put 3 coats of sealer on the wall tile and the floor grout.
Along the edges of the sink,
I caulked the gap, which looks much more polished and water proof.
Although the powder room is
‘done’ in the construction sense and we are using it now, there are still a few
outstanding items. The trim around the door and the door need painting. The
vanity doors need to be hung. I need to find a mirror; the old one looked too
busy with the tile. Also the room needs some art and maybe a shelf or something
above the toilet. There is no rush on that stuff so it will probably be another
couple of months before they are in place.
And now we know: a fun new
trick to caulking; wet your finger and run it along the caulking to make it
look extra smooth.