Saturday, July 17, 2010

Patching the Second Bedroom (1st time) & the Kitchen Ceiling (3rd time)

We are expecting a friend to stay with us for the August 20th weekend. So for that to happen we needed to have a guest room with a bed and walls that did not have a section made of garbage bags.

While doing that I figured I might as well patch the kitchen ceiling for the 3rd time. Not that the hole wasn’t a nice focal point.

The bedroom was painless. We have learnt that to match the thickness of the plaster it is best to use a ¼” sheet of drywall and a ½” sheet of drywall stacked, Then you do not need to put on 500 coats of mud trying to make up ¼” of thickness.

The kitchen started out well, I measured the drywall and marked the location of all the studs. My husband came to hold it in place while I screwed in the corners. That’s when the water started pouring out of the gap between the new and the old. We quickly took the new piece down and looked into the familiar hole. I had screwed through a supply pipe. The only drywall screws we had left were 3” and I managed to hit the only pipe within the area. Seriously the pipe is about 1” by 4” and the whole is about 36”x48”. Sucks.

My husband was very, very angry. He went and bought that magic putty stuff and patched the hole. We went to dinner and came home to a stream of water. Weighing our options we decided having running water outweighed the potential cost of an emergency plumber visit. Turned out that even thought it was 8pm on a Saturday night, the plumber happened to be working in the neighbourhood. He arrived in 15 minutes, replaced the section of pipe in another 15 and didn’t charge because “we are such good customers and have had such a rough year”. Awesome plumber!

I have since re-installed the drywall and put a coat of mud on without issue. It really makes the room brighter; there is more white ceiling for the light to bounce off of.

And now we know: everyone makes mistakes it is a part of life, you have to laugh when something like this happens.

Saturday, June 19, 2010

Painting the Dining Room


While the husbands away…I always tackle a project. This way he can’t say no!

Typically it takes a couple of weeks of prep work before he accepts a project and he never believes that it will look good in the end. Doing it while is gone means he can’t say no, can’t complain about the mess and can’t give me that look like “that could never possibly look good even though you are trained as a designer you are wrong”. He always walks back into the house after a trip somewhat hesitantly.

When we bought the house, I did not want to commit to colours for every room before moving in, but we still wanted to paint the 2 sitting rooms and the dining room before the furniture was in. So the dining room ended up white, just straight up out of the can white. Here is what it what the room looks like…kinda boring.

So to jazz it up I initially was going to run a boarder of wallpaper horizontally around the room at chair rail height. All the wallpapers in the home improvement stores were too b

old or not the right style of pattern, I knew I would get sick of them quickly. I wanted something soft and graphic; I like straight lines and geometric shapes. So I got out my tape and paint brush and got too it. The colour is one shade darker than the front hall.

I love it, it adds some personality to the room.

And now we know: creating this kind of pattern was much less painful than expected. Once the initial measuring was done (fun, I like rulers!), it was only half an hour each evening to put on 4 coats of paint, 2 white, 2 cream. And there was no leaking of paint under the tape, so no touch ups!

Sunday, June 6, 2010

Painting the Bathroom

After finishing the major work on the bathroom, the next step was painting. By now I was a little sick of spending hours on end in the bathroom during a heat wave with only a tiny window for air. Over a couple of evenings after work I put 2 coats on…and the results were so-so at best. It seemed more baby blue than the light barely there grey-blue I wanted.

After living with it for a while and installing the accessories that cover some of the colour, it has grown on me. A friend also pointed out that it will look better once the trim and door are painted white as opposed to the current yellowed-white.

And now we know: get paintable caulking, otherwise if the edge of your paint gets on the caulking and pieces will peel off.

Wednesday, May 26, 2010

Bathroom Day 8: Cleanup and the End of the Foundation Repairs

I had to return to work, but my husband stayed home to supervise the foundation guys. They finished up by filling in the basement trench with concrete and backfilling around the exterior walls. Considering that temperatures went up to 35 degrees Celsius over the past week, they did a great job keeping on schedule. We hope this solves the water problems and we can look towards someday having a finished basement again.

We decided to rent a dumpster to dispose of all the garbage from the reno. My husband spent the day loading it, putting tools away and trying to tame the chaos in the house. The bathroom is now at a state of 95% completion. Still to be done is painting, sealing the tile and putting up towel bars, which should all get done over the next week.

And now we know: we are capable of doing a big renovation project ourselves! It was an ambition project but we learnt a lot and produced a professional looking bathroom (without too much fighting!)

Tuesday, May 25, 2010

Bathroom Day 7: Caulking, Baseboards and a Rock Slinger

The foundation guys were back! This was the day the filled the trench with stone and huge truck with a conveyer belt to move the stone. They also began work in the basement, cutting the concrete floor and linking the weeping tile to the sump pit.

At this point the house was hectic. There was stuff everywhere; basement stuff moved to the living room, bathroom supplies in the front room, tools in the 2nd bedroom and hall. 3 to 5 construction workers traipsed in and out of the house all day and there was mud and dust everywhere.

This was the day we started putting the bathroom back together. I caulked and my husband installed the new fixtures. We installed new baseboard and quarter round. The toilet was put back in and the vanity moved into the room. The bathroom finally took shape and the end was in sight.

And now we know: they use some really cool machines for foundation work.

Monday, May 24, 2010

Bathroom Day 6: Grouting

After waiting 24 hours for the mortar and adhesive to dry, we set out to grout the tile. Starting with the wall I mixed half a box of non-sanded grout and got to work. My husband started to help and became very concerned that we would run out of grout due to quantity required for the mosaic border. Since it was 4 pm he rushed off to the only store open on the holiday Monday which happened to be on across the river.

I continued grouting, ran out and mixed the rest of the box. An hour later he returned to find me with the walls completed and still having grout remaining. He was not happy.

After a breather we began to work on the floors together. It went quickly but sanded grout is not as easy to work with. It required more pressure and more time on your hands and knees. The floor was also harder to clean the excess off of and get rid of the haze.

And now we know: grouting is quick and easy. Trust what the box says in terms of coverage.

Sunday, May 23, 2010

Bathroom Day 5: Floor Tiling Attempt 2

Sunday morning we headed out bright and early to get regular mortar. We used the same system of 1 person cutting and 1 person laying. This time just in case the mortar dried quickly, we layed out the entire floor and pre-cut all the tiles before we started. We then mixed the mortar and easily installed the tile. A couple of hours latter we were done and as a bonus had the afternoon free as we waited for it to dry.

And now we know: regular mortar works great, so does pre-cutting all the tiles.